MMA vs epoxy
Poly (methyl methacrylate) is a substance commonly referred to as MMA. It is a form of transparent plastic akin to acrylic glass that is used as a type of flooring.
The substance is sometimes erroneously referred to as plastic glass, though its properties very different to glass. Examples include Plexiglass, Perspex or Lucite, which are brand names of various kinds of MMA.
Acrylic glass has been used as far back as World War II for things such as gun turrets, canopies, windshields and even submarine periscopes.
Epoxy is also be defined as a type of plastic. However, epoxy production can be either petroleum-derived or it can be plant-derived.
Epoxies contain a hardener that transforms them from liquid to solid. This is called curing. For flooring purposes, common hardeners tend to be carboxylic acids or tertiary amines that are mixed to create an epoxy 3D flooring substance. Many of these hardeners can produce off-gassing, which can be harmful even days after installation.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 June
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.

















